Part numbers marked "replacement" are not affiliated with the original manufacture. Part numbers and pictures are used for cross reference only.
Description
Application
Sullair02250147-737 replacement
02250147-737 is regulator/blowdown manifold repair kit (Kit, Manifold Regulator / Blowdown 185DPQ) designed specifically portable screw air compressors. This kit is used for preventive maintenance or troubleshooting repair of the core air pressure regulation and unloading blowdown valve assembly of the air compressor, ensuring air tightness and stable operation of the equipment under harsh working conditions.
Core Functions and Benefits
• Precise Pressure Regulation (Regulator).
Repair the internal seals and pressure-sensing components of the pressure regulator to ensure the air compressor delivers the set pressure stably during load and unload switching, preventing system overpressure or insufficient air supply.
• Safe Blowdown.
Maintain the automatic pressure relief passage during shutdown or unloading to quickly and safely discharge residual pressure inside the oil-gas separator, and avoid damaging the motor or engine due to heavy starting under pressure in the next startup.
• Resistance to Severe Working Conditions.
Manufactured with original materials resistant to high temperature, high pressure and oil-gas corrosion, it can withstand the high-temperature oil-gas mixture and frequent pressure impacts inside the air compressor for a long time.
Typical Replacement Timing
When your 185 series air compressor shows the following symptoms, this repair kit is generally required for maintenance:
• Abnormal pressure relief.
The oil-gas separator tank cannot vent normally after shutdown, or the vent valve keeps leaking air during loaded operation.
• Pressure fluctuation.
The discharge pressure fails to stay stable at the rated value, and the pressure regulating knob malfunctions or responds sluggishly.
• Scheduled overhaul and maintenance.
Conduct preventive replacement of seals for the air circuit control valve assembly in accordance with the operating hour intervals specified in the original Sullair maintenance manual.